Implementation partner

Afrika Tikkun Services

Automated extract, not yet reviewed

Afrika Tikkun Services acts as a the programme Strategic Implementation Partner, recruiting, onboarding, training and placing candidates in host sites to deliver education, ECD, agriculture, greening, health and care, disability, micro-enterprise and waste-management activities. It works in Gauteng, Mpumalanga, KwaZulu-Natal, Limpopo and Eastern Cape.

Listed in: Jobs for Nature

Footprint

733 work sites in 31 catchments across Gauteng and KwaZulu-Natal and Limpopo and Mpumalanga. 47 are greening and environment sites, which count for the fund. 179 sites fall inside a strategic water source area.
Loading map…
  • Afrika Tikkun Services sites, sized by count. Nearby sites group together until you zoom in
  • Strategic water source area
  • C22 (Vaal)339
  • A21 (Limpopo)135
  • uMlazi (U60)40
  • B11 (Olifants)33
  • R20 (Mzimvubu–Tsitsikamma)30
  • U70 (Pongola–Mtamvuna)22
  • A71 (Limpopo)17
  • U40 (Pongola–Mtamvuna)16
  • C23 (Vaal)13
  • uMngeni (U20)12
  • X22 (Inkomati–Usuthu)9
  • C52 (Orange)8
  • X31 (Inkomati–Usuthu)8
  • A91 (Limpopo)7
  • M20 (Mzimvubu–Tsitsikamma)7
  • A23 (Limpopo)5
  • 15 more catchments32

Site locations are approximate, based on addresses.

Layers: DWS quaternary catchments (CSIR ArcGIS) · SANBI Strategic Water Source Areas 2017 · both queried 7 Oct 2026 · Basemap © OpenStreetMap contributors, greyscale · Catchments without a local name show the DWS tertiary code and water management area

Catchment and water source area for each site come from a spatial join of its geocoded point with the national layers. Not checked on the ground.

Sources: Programme payroll records; DWS quaternary catchments; Strategic Water Source Areas (2017)

People employed

Counted from payroll records. Totals only. No personal data. Participants exclude supervisors, timekeepers and admin. Positive exits are payroll exit reasons, not follow-up.

3,456

different people across 4 rounds · payroll-backed

Sources: Programme payroll records · Repeat participation table

514

worked in two rounds, and 79 in all three

Sources: Programme payroll records · Repeat participation table

567

worked at greening and environment sites, the work this fund pays for

Sources: Programme payroll records · Greening sites only

Whole programme and greening sites only
All roundsParticipantsWomenUnder 35With a disabilityPositive exits
Whole programme3,45666.7%84.1%94202
Greening sites only56761.6%84.1%155
Participants by round
RoundParticipantsWomenUnder 35Left for a jobLeft to studyPermanent job or enterprise
R11,00261.6%96.3%033
R292972.6%85.5%2126
R31,10468.2%75.4%05150
R41,04870.1%76%104220

Sources: Programme payroll records · Summary and exit reasons by round

Exit reasons as recorded on payroll. There is no follow-up of people after they leave. Positive exits: left for a job, further studies, or permanent employment or enterprise.

Evidence

All 177 results cleared for the demo, grouped by category. Each shows its confidence label, source, page and caveat.

Automated extract, not yet reviewed. These results were extracted automatically from Afrika Tikkun Services's reports and have not been checked line by line. Afrika Tikkun Services reports are cited by name and page only. They are not published or available for download. Every environmental result is partner-reported. Nothing is independently verified yet.

Executive Summary - milestones (Disability) (1)
  • Highest average that the programme met candidates' expectations (disability thematic area), Round 2

    98%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.1, Q1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Executive Summary - milestones (soft skills) (1)
  • Overall individual score in on-the-job learning skills (soft skills) across all five thematic areas, Round 2

    78%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.1, Q1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Executive Summary - sources of income (2)
  • Candidates depending on the programme stipend as a source of income, Round 2

    36%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.1, Q1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Candidates with other sources of income (child support, social grants), Round 2

    50%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.1, Q1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture and Food Security (1)
  • Recruited number (Agriculture and Food Security thematic area), Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.2, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture, Sustainability Initiatives (2)
  • Waste recycled monthly (average), Round 2

    1,167 kgPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.2, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Biomass produced monthly (average), Round 2

    987 kgPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.2, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture, Fruit Tree Planting (1)
  • Fruit trees planted (average over past eight months), Round 2

    30 treesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.3, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture, Food Gardens (2)
  • Food gardens established per month (average), Round 2

    5 gardensPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.3, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Individuals benefiting from food gardens monthly (average), Round 2

    44 individualsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.3, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture, Farm Profitability (1)
  • Afrika Tikkun Services Centurion farm average monthly profit, Round 2

    25,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.3, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Agriculture, High Achievers (1)
  • Top performer (Candidate 11) total income over the programme, Round 2

    75,404 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.4, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Micro Entreprise Development (1)
  • Recruited number (Micro Entreprise Development thematic area), Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.5, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Education (1)
  • Recruited number (Education thematic area), Round 2

    600 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.5, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Disability (1)
  • Recruited number (Disability thematic area), Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.7, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Project design - Disability (Ithembelihle host site) (1)
  • Participants accommodated at Ithembelihle host site, Round 2

    20 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.7, Q2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Skills and pathways - attrition table (4)
  • Number of participants who left the programme, Round 2

    182 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.9, Q3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have moved onto better roles as a result of the programme (Better = higher paying / longer-term work), Round 2

    0.04%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.9, Q3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have taken up studies as a result of the programme, Round 2

    0.02%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.9, Q3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have started or been able to sustain enterprise as a result of the programme, Round 2

    10%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.9, Q3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Skills and pathways - Pivotal Talent (1)
  • Participants who completed the Pivotal Talent online career guidance test, Round 2

    300 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.12, Q3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Value generated - Agriculture (1)
  • Estimated value generated for 9 months (Agriculture) - products sold, Round 2

    160,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.15, Q6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Value generated - Micro Entreprises (1)
  • Estimated value generated for 9 months (Micro Entreprises) - profits made, Round 2

    200,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.15, Q6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Value generated - Education (1)
  • Estimated value generated for 9 months (Education) - the amount of services, Round 2

    1,200,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.15, Q6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Value generated - Disability (1)
  • Estimated value generated for 9 months (Disability) - services of taking care of disabled people, Round 2

    120,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.15, Q6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Value generated - Futureprenuers (1)
  • Estimated value generated for 9 months (Futureprenuers) - profits made from selling Futurelife products, Round 2

    150,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.15, Q6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Food security and Balance Nutrition (4)
  • Number of participants trained in work readiness, Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained/onboarded in food security and balanced nutrition Futurepreneur project, Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of training sessions to capacitate Futurepreneurs, Round 2

    2 sessionsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Average revenue earned by Futurepreneurs from sale of nutritional products a month within local township communities excluding stipend, Round 2

    100,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Agriculture & Greening Theme (5)
  • Number of recycling and reusing initiatives established & maintained this month, Round 2

    6 initiativesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Agricultural produce donated/distributed to vulnerable homes /community members (Kg), Round 2

    80 kgPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Trees Planted this month, Round 2

    40 treesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Farm stall market days, Round 2

    2 market daysPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.18, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • How much biomass in Kg has been created this month, Round 2

    4,000 kgPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Education Theme (7)
  • Number of participants trained in work readiness, Round 2

    600 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of ECD children supported (1:8), Round 2

    21,600 childrenPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of interns/ECD assistants placed in ECD schools, Round 2

    300 interns/assistantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of additional courses completed by participants per month e.g. Mzansi digital (1:1), Round 2

    500 coursesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of children benefitting from ECD support this month, Round 2

    3,000 childrenPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of schools with scholar patrol or walking assistance this month, Round 2

    16 schoolsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of reading clubs run this month, Round 2

    40 reading clubsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Micro Entreprise Development (4)
  • Number of participants performing entrepreneur activities (such as selling their own crops from their home gardens or piece jobs with skills learnt from the programme), Round 2

    100 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • No off business created and/or supported, Round 2

    100 businessesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Average earning/income generated by entrepreneurs outside of the stipend received from the programme, Round 2

    100,000 ZARPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of 'micro' enterprises supported and mentored this month by workshops, Round 2

    100 enterprisesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Disability (4)
  • Number of people trained in simulatio/care/protective workshops established for people with disabilities, Round 2

    100 peoplePartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Protective Workshop/Simulation centres partnered with, Round 2

    6 centresPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of young people with disability who indicate that they have been empowered, supported and skilled as a result of the programme, Round 2

    300 peoplePartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.19, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of training sessions, Round 2

    10 sessionsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 2 · printed p.20, Section Five

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Other (47)
  • Number of participants trained in work readiness, Round 3

    226 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in the full value chain of Agriculture - from plant/animal…, Round 3

    226 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Seeds planted, Round 3

    273,300 seedsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Seedlings Planted, Round 3

    222,000 seedlingsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of plant/animal-based products harvested: Eggs (ea), Round 3

    47,000 eggsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of plant/animal-based products processed or value added, Round 3

    1,100 productsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of plant/animal-based products sold: Eggs (ea), Round 3

    39,000 eggsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Farm stall market days, Round 3

    34 market daysPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Agri employees/entrepreneurs developed, Round 3

    70 peoplePartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Agricultural produce donated/distributed to vulnerable homes /community members…, Round 3

    95 kgPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of candidates completing a financial literacy course, Round 3

    226 candidatesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of additional courses completed by participants through Mzansi digital platform Mi…, Round 3

    778 coursesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Accredited Agri Seta Plant Production NQF 1, Round 3

    80 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in work readiness, Round 3

    392 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in education sector specific training, Round 3

    392 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of ECD children supported (1:8), Round 3

    2,754 childrenPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of interns/ECD assistants placed in ECD schools, Round 3

    216 interns / assistantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of afterschool programmes supported, Round 3

    39 programmesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of interns placed in after school programmes, Round 3

    176 internsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of learners supported through after school programmes (Incl. tutoring, aftercare), Round 3

    2,800 learnersPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of candidates completing a financial literacy course, Round 3

    392 candidatesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of additional courses completed by participants through Mzansi digital platform Mi…, Round 3

    1,450 coursesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in work readiness, Round 3

    171 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in entrepreneurship skills, Round 3

    171 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of businesses created and/or supported, Round 3

    143 businessesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of businesses classified as social enterprises, Round 3

    46 businessesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of entrepreneurial sessions/initiatives implemented with youth entrepreneurs, Round 3

    22 sessions/initiativesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Broader Family members benefitting from the economic empowerment of young people to start…, Round 3

    387 family membersPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of candidates completing a financial literacy course, Round 3

    171 candidatesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of additional courses completed by participants through Mzansi digital platform Mi…, Round 3

    813 coursesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants trained in work readiness, Round 3

    176 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of people trained in simulation/care/protective workshops established for people w…, Round 3

    176 peoplePartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of Protective Workshop/Simulation centres partnered with, Round 3

    11 centresPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of young people with disability who indicate that they have been empowered, suppor…, Round 3

    62 young peoplePartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of candidates completing a financial literacy course, Round 3

    84 candidatesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of additional courses completed by participants through Mzansi digital platform Mi…, Round 3

    735 coursesPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.17-19

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Delivered work readiness training to 69% of participants, Round 3

    69%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • There was a 20% shift in leadership skills across all five thematic areas between the bas…, Round 3

    20%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • There was a 12% shift in soft skills related to punctuality and adaptability, Round 3

    12%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • The Education Support component ... was the most subscribed-to thematic area, with 392 pa…, Round 3

    392 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedp.3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Eight of our the programme participants are presently volunteering at Sunl…, Round 3

    8 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.7-8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Sunlit Gardens ... provides a safe and nurturing home for 42 abandoned and neglected chil…, Round 3

    42 childrenPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.7-8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • Number of participants who left the programme, Round 3

    86 participantsPartner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printed p.12, pathways table

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have moved onto better roles as a result of the programme. Better = highe…, Round 3

    0.8%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printed p.12, pathways table

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have taken up studies as a result of the programme, Round 3

    10%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printed p.12, pathways table

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • % of participants who have started or been able to sustain enterprise as a result of the …, Round 3

    35%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printed p.12, pathways table

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

  • host organisations (100% recommended the programme to others), Round 3

    100%Partner-reported

    Sources: Afrika Tikkun Services close-out report, Round 3 · printedpp.13-14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.

Education Support and ECD (19)
  • Number of participants trained in work readiness, Round 4

    457 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of ECD centres supported (same centres monthly), Round 4

    56 centresPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of afterschool programmes supported, Round 4

    15 programmesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 69 host sites accommodating a total of 457 candidates, Round 4

    69 sitesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of ECD centres supported (same centers monthly), Round 4

    87 centresPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of ECD children supported (1:8), Round 4

    4,254 childrenPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of afterschool programmes supported, Round 4

    35 programmesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of additional courses completed by participants through Mzansi digital platform Microsoft Accredited. (4 per candidate), Round 4

    2,317 coursesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13-14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 94% matric pass rate among assisted participants, Round 4

    94%Partner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.1, para 2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 433 active candidates placed across schools, Early Childhood Development (ECD) centres, and community centres in five provinces, Round 4

    433 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.2, para 1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 443 distinctions, our class of 2025, Round 4

    443 distinctionsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.2, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 61% bachelor passes, our class of 2025, Round 4

    61%Partner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.2, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Participants receive an additional R2,500 stipend from ECD principals for the days worked outside of the programme, Round 4

    2,500 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.2, para 2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Josephine Primary School hosts 18 assistant teachers who are part of our the programme programme, Round 4

    18 teachersPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.3, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • seven of them being qualified teachers registered with the Department of Education, Round 4

    7 teachersPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.3, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • three holding different qualifications, Round 4

    3 teachersPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.3, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • nine who moved into learnership possibilities, Round 4

    9 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • twenty who are continuing their education, Round 4

    20 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • participants receive top-ups from the principals that range from R1000 to R4000, Round 4

    4,000 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.9, Pathways para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Greening and Environment (12)
  • Number of participants trained in work readiness, Round 4

    302 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in the full value chain of Agriculture - from plant/animal products production to food preparation, to distribution and retail, Round 4

    134 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of Seeds planted, Round 4

    37,800 seedsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • A total of 302 individuals were successfully placed through these partnerships, Round 4

    302 individualsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • the farm transplanted 2 326 seedlings, Round 4

    2,326 seedlingsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.3-4

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • planted 1 800 seeds, Round 4

    1,800 seedsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.3-4

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in work readiness, Round 4

    0 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in the full value chain of Agriculture - from plant/animal products production to food preparation, to distribution and retail, Round 4

    63 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of Seeds planted, Round 4

    93,252 seedsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of plant/animal-based products sold: Eggs (ea), Round 4

    27,087 eaPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • sales at the Green Acres Farm in Gauteng increased dramatically to R53,984.50 during the quarter, Round 4

    53,984.5 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.5, para 1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • which was achieved with 16 Participants, Round 4

    16 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.5, last para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Health and Care (16)
  • Number of participants trained in work readiness, Round 4

    208 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of Protective Workshop/Simulation centres partnered with, Round 4

    8 centresPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of young people with disability who indicate that they have been empowered, supported and skilled as a result of the programme, Round 4

    39 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Afrika Tikkun Services has successfully placed 208 Health and Care candidates across Gauteng, Mpumalanga, KwaZulu-Natal, the Eastern Cape, and Limpopo, Round 4

    208 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 39 of these participants are people with disabilities, Round 4

    39 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • The duties are spread among 11 partner Health and Care groups, Round 4

    11 organisationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • The host site currently accommodates 10 the programme candidates, placed across different departments, Round 4

    10 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.6

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in work readiness, Round 4

    0 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of people trained in simulation/care/protective workshops established for people with disabilities, Round 4

    66 peoplePartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of Protective Workshop/Simulation centers partnered with, Round 4

    16 centersPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of young people with disability who indicate that they have been empowered, supported and skilled as a result of the programme, Round 4

    40 young peoplePartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of additional courses completed by participants through Mzansi digital platform Microsoft Accredited (4 per candidate), Round 4

    1,005 coursesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • This sector consists of 204 candidates, Round 4

    204 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.6, para 1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • the programme currently supports 9 partner organisations within the Health and Care sector, Round 4

    9 organisationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.6, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 7 of which focus on services for children and adults living with disabilities, Round 4

    7 organisationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.6, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • The five children living with a disability have seen some remarkable developments following the presence of the programme candidates, Round 4

    5 childrenPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.6-7, para 4

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Micro-enterprise (14)
  • Number of participants trained in work readiness, Round 4

    33 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of businesses created and/or supported, Round 4

    33 businessesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Average earning/income generated by entrepreneurs outside of the stipend received from the programme, Round 4

    161,700 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 23 people have successfully registered their businesses through the program, Round 4

    23 businessesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.7

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of additional courses completed by participants through Mzansi digital platform Microsoft Accredited. (4 per candidate), Round 4

    865 coursesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.13

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in work readiness, Round 4

    0 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of participants trained in entrepreneurship skills, Round 4

    50 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of businesses created and/or supported, Round 4

    50 businessesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Average earning/income generated by entrepreneurs outside of the stipend received from the programme, Round 4

    92,925 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Number of additional courses completed by participants through Mzansi digital platform Microsoft Accredited. (4 per candidate), Round 4

    485 coursesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.14

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • three masterclasses have been held so far, Round 4

    3 masterclassesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.7, para 2

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • At present, 35 entrepreneurs have managed to register their businesses under the micro-enterprise category, Round 4

    35 entrepreneursPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.7, para 3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Future Life partner currently has 10 active candidates in the programme 4 programme, Round 4

    10 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.7, para 5

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 485 courses were completed among the 50 macro enterprise participants, Round 4

    485 coursesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.8, para 1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Employment and pathways (10)
  • KwaZulu-Natal received 3,315 applications [via SAYouth.mobi job application campaign], Round 4

    3,315 applicationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • the Eastern Cape with 1,862 [applications], Round 4

    1,862 applicationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Gauteng with 1,520 [applications], Round 4

    1,520 applicationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Mpumalanga with 1,880 [applications], Round 4

    1,880 applicationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Limpopo [with] 2,656 [applications], Round 4

    2,656 applicationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • there are only 1,000 employment openings in the program, Round 4

    1,000 openingsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 657 the programme 4 participants attended a work readiness training led by highly trained Afrika Tikkun facilitators, Round 4

    657 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.8-9, 5. Pathways

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • The number of hosting organizations increased from 85 to 122 throughout five provinces, Round 4

    122 organizationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.8, Governance para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 79 participant replacements were noted, Round 4

    79 participantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Ten candidates who obtained full-time formal work, Round 4

    10 candidatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.8

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Digital learning (3)
  • A total of 913 course certificates have been awarded from the cohort of 1,000 the programme 4 participants, Round 4

    913 certificatesPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 657 new applicants having enrolled on the portal thus far, Round 4

    657 applicantsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.1

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Every month, all the programme 85 host partners gather online to discuss operational issues, assess progress and make sure the program's goals are being met, Round 4

    85 partnersPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.8, 3. Governance

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Waste management (4)
  • the programme program worked with sixteen agriculture and waste management organizations spread across four provinces, Round 4

    16 organisationsPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printedp.3

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • Total waste collected is 180 798 KG, Round 4

    180,798 KGPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.5, last para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 20 547 KG of Biomass, Round 4

    20,547 KGPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.5, last para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • the value for waste collected and sold is R186 454, Round 4

    186,454 ZARPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.5, last para

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Organisational Capacity and Sustainability (2)
  • the Board meets four times a year to analyse organizational performance, provide oversight, and set long-term goals, Round 4

    4 meetings per yearPartner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.8, 3. Governance

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

  • 100% biometric clock-in compliance in February, Round 4

    100%Partner-reported

    Sources: Afrika Tikkun Services quarterly report, Round 4 · printed p.1, para 4

    Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.

Labels used: Partner-reported Payroll-confirmed Independently verified (none yet)

Finance-readiness checklist

What funders usually ask for, and where Afrika Tikkun Services stands. An automated checklist: items marked Not assessed have not been reviewed yet.
  • Baselines

    Not assessed

    Not yet reviewed.

  • Work locations

    Partial

    733 sites from geocoded addresses; 47 are greening and environment sites. No GPS or work polygons.

  • Costs

    Not assessed

    Not yet reviewed.

  • Land rights

    Not assessed

    Not yet reviewed.

  • Permits

    Not assessed

    Not yet reviewed.

  • Monitoring

    Not assessed

    Not yet reviewed.

  • Evidence of water benefit

    Missing

    No measured or modelled water benefit.

  • Employment after exit (3 and 6 months)

    Missing

    Payroll records exit reasons only. No follow-up after people leave.

  • Independent verification

    Missing

    Environmental results are self-reported. People numbers come from payroll.

  • Buyer or payer interest

    Not assessed

    Not yet reviewed.

  • Contracted revenue

    Not assessed

    Not yet reviewed.

What Afrika Tikkun Services says about its programme

Statements from Afrika Tikkun Services's own reports, labelled as intended or reported. Not verified. Automated extract, not yet reviewed.
Outcomes Afrika Tikkun Services aims for or reports (16)
  • [the programme] addresses unemployment, empowers and trains young people as entrepreneurs, and assists communities.

    Intended outcome · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Cradle-to-career 360 Degrees model leaves a legacy of empowered youth, economic development, inclusive society and comprehensive support.

    Intended outcome · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Sustainability rests on diverse funding, capacity building, community involvement and rigorous evaluation.

    Intended outcome · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • [the programme] participation gave a participant (Thato David Mkansi) leadership skills, professional foundation, and confidence to pursue larger opportunities and advocate for youth mental health.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Micro-enterprise support enabled a participant (Karabo Pauline Phokwane) to grow her flower business (Blossom Bliz) through work preparation training and social media marketing.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • reducing unemployment, upskilling the youth, providing opportunities to learn about different fields, and providing financial relief

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • improving ECD outcomes

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • healthier community spaces and access to locally produced food

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • communities and participants continue to benefit beyond funded period

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Pathway from unemployment to self-employment in the creative/photography sector.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Pathway to long-term employment in the ECD sector via practical skills development.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Excluded youth gain access to work and training opportunities.

    Reported by the partner · Round 2

  • Participants are more likely to be placed and retained in jobs or enterprise activities.

    Reported by the partner · Round 2

  • Participants gain sustainable livelihoods through employment and self-employment.

    Reported by the partner · Round 2

  • Workplace experience strengthens employability and income generation.

    Reported by the partner · Round 2

  • Diversity and contribution are valued in communities.

    Reported by the partner · Round 2

Lessons Afrika Tikkun Services reports (11)
  • Implementing thematic area evaluations and capturing success stories enhanced M&E practices; regular site visits built stronger relationships and provided tailored support, improving overall programme effectiveness.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Effective candidate management requires discipline and work-ethic training; addressing issues early prevents disruptions and ensures a cohesive work environment.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Introducing biometric clock-ins and clock-outs effectively eliminated fraudulent activities, ensuring participants were physically present and engaged and enhancing accountability.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Providing PPE and [the programme] t-shirts ensured safety and identifiability, fostering pride and professionalism among participants.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Investing in training and capacity building for both staff and participants significantly improved programme delivery and long-term outcomes.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Engaging the community and forming partnerships during the planning phase ensures the programme meets community needs, fosters ownership and leverages local resources and expertise.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Work-based learning coupled with stipends proved effective for engaging unemployed youth while delivering community benefit.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Technical support and regular communication were essential for effective host site management.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • [the programme] stipend enabled purchase of photography equipment, creating an additional income stream and a pathway from unemployment to entrepreneurship in the creative sector.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Practical, hands-on skills gained as team leader at Zukisa Educare Center strengthen chances of long-term employment in the ECD sector.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • [the programme] support enabled skills sharpening (work ethics, personal branding, Excel, Canva) and financial relief, growing an automotive detailing business that has created employment for three young individuals.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

Barriers Afrika Tikkun Services reports (21)
  • At Soshange, some of the 10 candidates exhibited disrespect towards team leaders and hosts.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Shortage of Learning and Teaching Materials: Many schools faced material shortages, including limited access to photocopying machines and stationery. This affected the preparation of learner activities and delayed some classroom tasks.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Learner Developmental Gaps: A number of children struggle with basic concepts due to limited early childhood development (ECD) exposure.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Crime and Safety Concerns: Several host schools reported incidents of theft, including stolen computer equipment and stationery. Break-ins have further disrupted school operations.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Weather-Related Absenteeism: The rainy weather during the month resulted in high absenteeism among learners, which affected teaching progress; roads and school grounds became flooded.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • The rainy season has slowed business operations, as some sites are inaccessible.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Customers taking loans and delaying payments.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Some selling points require municipal registration, limiting access.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Load shedding affects the business a lot especially those that cook fresh food.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Time sheets lead to a low clock-in percentage. When the project started in October, there were insufficient funds to buy timekeepers smartphones, so most timekeepers used their own phones to clock in. They end up not logging in the whole eight hours as asked because Ram is low and frequently kicks them off of the system.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Staff members not being able to contract and link participants to locality and Payroll.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • The 7-day work month model created flexibility but limited income and impact potential.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Digital clock-in system faced significant challenges in areas with poor connectivity.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Some host organisations lacked structured work plans for candidates.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • ECD centre support actual was below target and the source says onboarding more ECD centres needs improvement.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • The source says participants living with disability/intellectual disability and older care workers affected Mzansi course completion.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Older plants removed earlier than anticipated due to crop stress/damage, causing a production lag while awaiting mature crops; water and electricity interruptions disrupted planting schedules and crop rotation plans.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Water scarcity due to lack of rain, forcing reliance on 20-litre buckets to water plants.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Difficulty some parents face in accepting their children's conditions, impacting both families and participants.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Only 1000 participants trained; an error was made when signing the [the programme] 4 contract indicating a 1200 target.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Insufficient budget allocation for training may affect the project, caused by the 1200-participant target while only 1000 participants are active/trained.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

How Afrika Tikkun Services adapted (3)
  • Requested Time keepers to use personal Phones for clocking in participants.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Start payroll process in the evening or early hours so as to not use the system while other SIPs are utilising the system.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Exploring alternative solutions to establish a sustainable water system.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

Recommendations from Afrika Tikkun Services (8)
  • Future programmes should incorporate regular site visits and thematic area evaluations to foster relationships and provide targeted support.

    Intended outcome · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Implement comprehensive discipline and work-ethics training.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Biometric systems should be a standard practice for future programmes.

    Intended outcome · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Prioritise continuous capacity-building initiatives for all involved.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Involve local stakeholders in all thematic areas during inclusive planning.

    Reported by the partner · Round 2 · Afrika Tikkun Services close-out report, Round 2

  • Improve the clock-in system to accommodate network and data challenges.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • More pathways to formal employment or enterprise development need to be established.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • At this stage, there are no additional funds to do the recruitment and training of the additional 200 participants.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

Sustainability, as Afrika Tikkun Services reports it (3)
  • The programme reports skills development, community service structures, entrepreneurial culture and host organisation capacity as legacies.

    Reported by the partner · Round 3 · Afrika Tikkun Services close-out report, Round 3

  • Considering the total number of people trained thus far, currently at 83% of the project's 1200 target.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Partnership established with Horsepower Motorsport; plans to relocate to a larger workspace and grow to employ at least 10 people.

    Intended outcome · Round 4 · Afrika Tikkun Services quarterly report, Round 4

What helped Afrika Tikkun Services (4)
  • Candidates have discovered new high-traffic sites, which has increased sales and expanded their reach.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • They have leveraged social media networks to advertise their businesses, gaining more exposure.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • Programme facilitates involvement of professional healthcare practitioners to provide guidance, psychosocial support, and capacity building for parents and candidates.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

  • The “learning and earning” principle continues to be pivotal in ensuring the programme thrives, with participants actively participating through the Mzansi platform.

    Reported by the partner · Round 4 · Afrika Tikkun Services quarterly report, Round 4

Sources

  • Programme payroll records · Export dated 28 Sep 2026. Totals only; no personal data shown.
  • DWS quaternary catchments · Via CSIR ArcGIS service, queried 7 Oct 2026
  • Strategic Water Source Areas (2017) · SANBI BGIS, queried 7 Oct 2026
  • Afrika Tikkun Services close-out report, Round 2 · Partner report. Cited by name and page only.
  • Afrika Tikkun Services close-out report, Round 3 · Partner report. Cited by name and page only.
  • Afrika Tikkun Services quarterly report, Round 4 · Partner report. Cited by name and page only.
  • Afrika Tikkun Services quarterly report, Round 4 · Partner report. Cited by name and page only.

Partner reports are cited by name and page only, never linked publicly.