Conservation South Africa
Conservation South Africa implements the programme through conservation and environmental work, including rangeland management, water and spring protection, erosion control, bush thinning, alien plant removal, waste management, training, governance and livelihood-linked livestock and wool/fibre activities. It works in Mpumalanga, Northern Cape and Eastern Cape.
Listed in: Jobs for Nature
Footprint
- Conservation South Africa sites, sized by count. Nearby sites group together until you zoom in
- Strategic water source area
- X32 (Inkomati–Usuthu)51
- Kinira (T33)44
- F30 (Orange)35
- F40 (Orange)15
- X40 (Inkomati–Usuthu)14
- F20 (Orange)11
- B73 (Olifants)9
- F50 (Orange)9
- X31 (Inkomati–Usuthu)9
- Mzimvubu (upper) (T31)6
- T34 (Mzimvubu–Tsitsikamma)4
- T32 (Mzimvubu–Tsitsikamma)2
- T35 (Mzimvubu–Tsitsikamma)2
Site locations are approximate, based on addresses.
Layers: DWS quaternary catchments (CSIR ArcGIS) · SANBI Strategic Water Source Areas 2017 · both queried 7 Oct 2026 · Basemap © OpenStreetMap contributors, greyscale · Catchments without a local name show the DWS tertiary code and water management area
Catchment and water source area for each site come from a spatial join of its geocoded point with the national layers. Not checked on the ground.
Sources: Programme payroll records; DWS quaternary catchments; Strategic Water Source Areas (2017)
People employed
2,648
different people across 3 rounds · payroll-backed
Sources: Programme payroll records · Repeat participation table
2,648
worked at greening and environment sites, the work this fund pays for
Sources: Programme payroll records · Greening sites only
| All rounds | Participants | Women | Under 35 | With a disability | Positive exits |
|---|---|---|---|---|---|
| Whole programme | 2,648 | 62% | 55.4% | 25 | 56 |
| Greening sites only | 2,648 | 62% | 55.4% | 25 | 56 |
| Round | Participants | Women | Under 35 | Left for a job | Left to study | Permanent job or enterprise |
|---|---|---|---|---|---|---|
| R2 | 1,245 | 60.7% | 55.8% | 0 | 4 | 9 |
| R3 | 1,078 | 62.4% | 51.3% | 0 | 4 | 11 |
| R4 | 1,351 | 63.6% | 55.1% | 28 | 0 | 0 |
Sources: Programme payroll records · Summary and exit reasons by round
Exit reasons as recorded on payroll. There is no follow-up of people after they leave. Positive exits: left for a job, further studies, or permanent employment or enterprise.
Evidence
Automated extract, not yet reviewed. These results were extracted automatically from Conservation South Africa's reports and have not been checked line by line. Conservation South Africa reports are cited by name and page only. They are not published or available for download. Every environmental result is partner-reported. Nothing is independently verified yet.
Skills acquired and pathways for participants (1)
| Result | Value | Confidence | Source | Caveat |
|---|---|---|---|---|
| K2C: 10 the programme transitioned into YES programme, which is a longer-term programme of 12 months and focuses on work readiness, Round 3 | 10 participants | Partner-reported | Sources: Conservation South Africa close-out report, Round 3 · Table 1, Skills acquired and pathways row | Automated extract from the partner's reports. Not yet reviewed line by line. |
K2C: 10 the programme transitioned into YES programme, which is a longer-term programme of 12 months and focuses on work readiness, Round 3
10 participantsPartner-reportedSources: Conservation South Africa close-out report, Round 3 · Table 1, Skills acquired and pathways row
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line.
Greening the Environment (39)
| Result | Value | Confidence | Source | Caveat |
|---|---|---|---|---|
| Programme Indicator 1: Number of participants recruited, Round 4 | 1,355 people | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 1 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 2: Number of Village Climate Risk & Response Plans (New Villages), Round 4 | 0 plans | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 2 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 3: Number of people formally trained, Round 4 | 124 people | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 3 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 4: Number of people informally trained, Round 4 | 1,355 people | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 4 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 5: Number of Village Engagement Meeting Minutes, Round 4 | 60 minutes | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 5 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 6: Number of Work Plans, Round 4 | 3 work plans | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 6 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 7: Number of Lessons Learned Workshops, Round 4 | 1 workshops | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 7 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 8: Area of community grazing land under improved management (hectares), Round 4 | 0 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 8 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 9: Number of springs (wetlands) rehabilitated, Round 4 | 0 springs | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 9 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 10: Area hectares of erosion stabilized (hectares), Round 4 | 0 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 10 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 11: Bush thinned or Alien Invasive Plants removed (hectares), Round 4 | 0 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 11 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 12: Number of Fire Management Protocols, Round 4 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 12 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 13: Number of Drought Management Protocols, Round 4 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 13 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 14: Number of Flood Management Protocols (New Villages), Round 4 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 14 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 15: Waste Collected (Kg), Round 4 | 0 Kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 15 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 16: Waste recycled (kg), Round 4 | 0 kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 16 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 17: Livestock (cattle, sheep & goats) sold, Round 4 | 0 head | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 17 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 18: Wool and Fiber sold Kg, Round 4 | 0 Kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 18 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| First Aid - Accredited Unit Standard (EC & NC Completed, Team Leaders & 1 General Worker each = 124 of 208 total), Round 4 | 124 participants | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 2, Thematic Area 1 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 1: Number of participants recruited, Round 4, Q2 | 1,400 participants | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 1 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 2: Number of Village Climate Risk & Response Plans (New Villages), Round 4, Q2 | 0 plans | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 2 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 3: Number of people formally trained, Round 4, Q2 | 309 people | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 3 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 5: Number of Village Engagement Meeting Minutes, Round 4, Q2 | 147 minutes | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 5 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 6: Number of Work Plans, Round 4, Q2 | 128 work plans | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 6 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 7: Number of Lessons Learned Workshops, Round 4, Q2 | 2 workshops | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 7 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 8: Area of community grazing land under improved management (hectares), Round 4, Q2 | 223,908 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 8 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 9: Number of springs (wetlands) rehabilitated, Round 4, Q2 | 4 springs | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 9 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 10: Area hectares of erosion stabilized (hectares), Round 4, Q2 | 97.08 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 10 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 11: Bush thinned or Alien Invasive Plants removed (hectares), Round 4, Q2 | 83.68 ha | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 11 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 12: Number of Fire Management Protocols, Round 4, Q2 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 12 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 13: Number of Drought Management Protocols, Round 4, Q2 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 13 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 14: Number of Flood Management Protocols (New Villages), Round 4, Q2 | 0 protocols | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 14 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 15: Waste Collected (Kg), Round 4, Q2 | 31,657.2 Kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 15 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 16: Waste recycled (kg), Round 4, Q2 | 29,586 kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 16 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 17: Livestock (cattle, sheep & goats) sold, Round 4, Q2 | 2,187 head | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 17 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Programme Indicator 18: Wool and Fiber sold Kg, Round 4, Q2 | 22,481 Kg | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 18 | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| First Aid Training to Team Leaders and one General Worker per team of ten (Total participants), Round 4, Q2 | 78 participants | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 2, row: Pathways | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Participants from Eastern Cape who attended accredited Eco-Rangers training, Round 4, Q2 | 6 participants | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · Table 2, row: Pathways | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
| Households benefiting directly from Magxeni water tank installation, Round 4 | 15 households | Partner-reported | Sources: Conservation South Africa quarterly report, Round 4 · body paragraph, 04 March 2026; Location: Magxeni | Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals. |
Programme Indicator 1: Number of participants recruited, Round 4
1,355 peoplePartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 1
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 2: Number of Village Climate Risk & Response Plans (New Villages), Round 4
0 plansPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 2
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 3: Number of people formally trained, Round 4
124 peoplePartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 3
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 4: Number of people informally trained, Round 4
1,355 peoplePartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 4
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 5: Number of Village Engagement Meeting Minutes, Round 4
60 minutesPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 5
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 6: Number of Work Plans, Round 4
3 work plansPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 6
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 7: Number of Lessons Learned Workshops, Round 4
1 workshopsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 7
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 8: Area of community grazing land under improved management (hectares), Round 4
0 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 8
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 9: Number of springs (wetlands) rehabilitated, Round 4
0 springsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 9
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 10: Area hectares of erosion stabilized (hectares), Round 4
0 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 10
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 11: Bush thinned or Alien Invasive Plants removed (hectares), Round 4
0 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 11
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 12: Number of Fire Management Protocols, Round 4
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 12
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 13: Number of Drought Management Protocols, Round 4
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 13
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 14: Number of Flood Management Protocols (New Villages), Round 4
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 14
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 15: Waste Collected (Kg), Round 4
0 KgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 15
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 16: Waste recycled (kg), Round 4
0 kgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 16
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 17: Livestock (cattle, sheep & goats) sold, Round 4
0 headPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 17
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 18: Wool and Fiber sold Kg, Round 4
0 KgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, Programme Indicator 18
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
First Aid - Accredited Unit Standard (EC & NC Completed, Team Leaders & 1 General Worker each = 124 of 208 total), Round 4
124 participantsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 2, Thematic Area 1
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 1: Number of participants recruited, Round 4, Q2
1,400 participantsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 1
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 2: Number of Village Climate Risk & Response Plans (New Villages), Round 4, Q2
0 plansPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 2
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 3: Number of people formally trained, Round 4, Q2
309 peoplePartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 3
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 5: Number of Village Engagement Meeting Minutes, Round 4, Q2
147 minutesPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 5
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 6: Number of Work Plans, Round 4, Q2
128 work plansPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 6
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 7: Number of Lessons Learned Workshops, Round 4, Q2
2 workshopsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 7
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 8: Area of community grazing land under improved management (hectares), Round 4, Q2
223,908 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 8
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 9: Number of springs (wetlands) rehabilitated, Round 4, Q2
4 springsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 9
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 10: Area hectares of erosion stabilized (hectares), Round 4, Q2
97.08 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 10
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 11: Bush thinned or Alien Invasive Plants removed (hectares), Round 4, Q2
83.68 haPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 11
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 12: Number of Fire Management Protocols, Round 4, Q2
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 12
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 13: Number of Drought Management Protocols, Round 4, Q2
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 13
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 14: Number of Flood Management Protocols (New Villages), Round 4, Q2
0 protocolsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 14
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 15: Waste Collected (Kg), Round 4, Q2
31,657.2 KgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 15
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 16: Waste recycled (kg), Round 4, Q2
29,586 kgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 16
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 17: Livestock (cattle, sheep & goats) sold, Round 4, Q2
2,187 headPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 17
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Programme Indicator 18: Wool and Fiber sold Kg, Round 4, Q2
22,481 KgPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 6, row: Programme Indicator 18
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
First Aid Training to Team Leaders and one General Worker per team of ten (Total participants), Round 4, Q2
78 participantsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 2, row: Pathways
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Participants from Eastern Cape who attended accredited Eco-Rangers training, Round 4, Q2
6 participantsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · Table 2, row: Pathways
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Households benefiting directly from Magxeni water tank installation, Round 4
15 householdsPartner-reportedSources: Conservation South Africa quarterly report, Round 4 · body paragraph, 04 March 2026; Location: Magxeni
Caveat: Automated extract from the partner's reports. Not yet reviewed line by line. Period figure; do not add to close-out totals.
Labels used: Partner-reported Payroll-confirmed Independently verified (none yet)
Finance-readiness checklist
Baselines
Not assessedNot yet reviewed.
Work locations
Partial211 sites from geocoded addresses; 211 are greening and environment sites. No GPS or work polygons.
Costs
Not assessedNot yet reviewed.
Land rights
Not assessedNot yet reviewed.
Permits
Not assessedNot yet reviewed.
Monitoring
Not assessedNot yet reviewed.
Evidence of water benefit
MissingNo measured or modelled water benefit.
Employment after exit (3 and 6 months)
MissingPayroll records exit reasons only. No follow-up after people leave.
Independent verification
MissingEnvironmental results are self-reported. People numbers come from payroll.
Buyer or payer interest
Not assessedNot yet reviewed.
Contracted revenue
Not assessedNot yet reviewed.
What Conservation South Africa says about its programme
Outcomes Conservation South Africa aims for or reports (11)
Co-funded PPE/tools provision to K2C landscape supports continuity of fieldwork.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Accredited First Aid/HSE and Eco-Rangers training builds transferable skills supporting participant pathways to employment and micro-enterprise beyond the project.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
10 villages have increased resilience to climate change through improved access to clean water, improved grazing land, and reduced fire risk; improved livelihoods of young people living in these areas.
Reported by the partner · Round 3
Villagers are better prepared to adapt to climate change.
Reported by the partner · Round 4
Climate-smart work and social opportunities for disadvantaged rural communities.
Reported by the partner · Round 4
Villages are more resilient to extreme weather and resource insecurity.
Reported by the partner · Round 4
Enhanced individual and community capacity to respond to climate risks.
Reported by the partner · Round 4
Ecosystem function and access to ecosystem services improved.
Reported by the partner · Round 4
Increased economic resilience and self-reliance.
Reported by the partner · Round 4
Increased accuracy of data collected and reported.
Reported by the partner · Round 4
Sustained support for climate resilience programming.
Reported by the partner · Round 4
Lessons Conservation South Africa reports (7)
On the job skills learnt: Nature conservation - hands on experience in nature conservation, climate change, fire management and clearing wattle; some participants beginning to explore a career in nature conservation.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Water Management - participants acquired experience in spring protection and maintenance, understanding importance of safeguarding water sources for sustainable community supply.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Provision of PPE's, Uniform and Tools - valued the quality of tools and PPE/uniforms provided, enabling safe and comfortable work.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Use of Biometrics on the [the payroll system] System was the most effective and reliable way of tracking attendance, despite occasional technical glitches.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Salaries were received promptly with no delays, which the team appreciated.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
This cohort was included in two phases although [the programme] typically enrolls individuals for one phase; CSA advocated for IDC to extend the phase, ending April 20, 2025. If IDC approves a new phase, new participants will be hired so more of the community benefits.
Intended outcome · Round 3 · Conservation South Africa close-out report, Round 3
No major challenges were experienced during the start-up phase; minor operational adjustments were resolved within the quarter.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Barriers Conservation South Africa reports (22)
Validating participant documentation and finalising attendance system.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Severe weather conditions resulted in the areas around the Kruger to Mozambique being flooded; no work could be done in January 2026 due to safety concerns.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Participants leaving work early or not reporting, late arrivals, alcohol use at work, a team leader pawning off the [the programme] cellphone, and a participant refusing [the payroll system] biometric enrolment.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Election-year employment programmes: Competing public employment initiatives during the election period presented alternative opportunities and were identified as the largest contributing factor to drop-offs.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
The original PPE budget has been completely depleted and CSA is not able to cover further replacement costs due to higher than normal drop offs (average PPE cost of R3,000.00/participant, adding R294,000 to the PPE Budget for 98 drop-offs).
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Delays in procuring PPE and tools may prevent teams from conducting fieldwork, resulting in reduced outputs and participants remaining office bound.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Disruption of programme continuity; inability to sustain community work beyond funded periods; loss of impact in priority communities.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Weak or inconsistent collaboration with local partners may slow implementation, limit access to communities, or delay permissions needed for field activities.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Insufficient support from key stakeholders or community beneficiaries may reduce participation levels, hinder site access, or slow programme rollout.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Incomplete or late submission of participant records, attendance, or payroll documentation may affect payment accuracy and audit readiness.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Daily targets not met on certain days due to heavy rains, steep terrain, difficulties related to gender and health conditions of workers, and challenge of tools that had to be shared.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Signing in at a working place far from home negatively impacted time management, particularly on rainy days (30 minutes to an hour walking).
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Some plot sizes/hectare measurements too large for certain individuals, particularly some female workers and those with health conditions, causing difficulty meeting daily targets.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Limited supply of PPE's forced sharing, resulting in delays meeting daily targets; cutting blades frequently got damaged.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Lack of Site Manager visits left participants' concerns and challenges unaddressed.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Cattle caused issues with stored grass for future grazing.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Minor operational adjustments such as validating participant documentation and finalising attendance systems
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Delays in procuring PPE and tools may prevent teams from conducting fieldwork, resulting in reduced outputs and participants remaining office-bound.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Disruption of programme continuity; inability to sustain community work beyond funded periods; loss of impact in priority communities.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Weak or inconsistent collaboration with local partners may slow implementation, limit access to communities, or delay permissions needed for field activities.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Insufficient support from key stakeholders or community beneficiaries may reduce participation levels, hinder site access, or slow programme rollout.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Incomplete or late submission of participant records, attendance, or payroll documentation may affect payment accuracy and audit readiness.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
How Conservation South Africa adapted (7)
With minor operational adjustments, these challenges were resolved within the quarter.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
The working days were on-passed to the month of February.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Improve procurement planning, maintain buffer stock levels, and streamline approval processes to ensure timely resource allocation.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Diversify funding sources, including pursuing match-funding opportunities from synergistic programmes such as ECOWYL, GAC, and AKO; strengthen financial planning to prioritise essential implementation costs.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Strengthen local partnership engagement plans, hold regular coordination meetings, and formalise roles through MoUs or structured commitments.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Intensify stakeholder involvement, maintain transparent communication, hold monthly community structure engagements, and use traditional authority structures to reinforce local legitimacy.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Conduct routine compliance checks, ensure all landscapes update the [the payroll system] system weekly, and provide refresher training for HR and site managers.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Recommendations from Conservation South Africa (11)
Improve procurement planning, maintain buffer stock levels, and streamline approval processes to ensure timely resource allocation.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Diversify funding sources, including pursuing match funding opportunities from synergistic programmes such as ECOWYL, GAC, and AKO; strengthen financial planning to prioritise essential implementation costs.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Strengthen local partnership engagement plans, hold regular coordination meetings, and formalise roles through MoUs or structured commitments.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Intensify stakeholder involvement, maintain transparent communication, hold monthly community structure engagements, and use traditional authority structures to reinforce local legitimacy.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Conduct routine compliance checks, ensure all landscapes update the [the payroll system] system weekly, and provide refresher training for HR and site managers.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
The issue of signing-in could be revisited.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Workers require training on how hectares are measured.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Require more blades or higher-quality ones.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Request more regular visits from Site Managers to assess work, provide support and guidance.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Site Managers to facilitate community meetings on keeping cattle from stored grass; installing fencing could protect the grazing field.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Extend working days from 8 to a minimum of 11-15 per month; increase salary; ensure timely material deliveries; provide stone for sharpening axes; more frequent Site Manager visits; provide raincoats, gumboots, and hard-cap knee pads/supporters.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Sustainability, as Conservation South Africa reports it (2)
Requested guidance from the IDC on how to co-fund in this situation.
Reported by the partner · Round 4 · Conservation South Africa quarterly report, Round 4
Approach to dealing with IOD and match funding. Social benefits - skills, CRRP, value nature. Economic benefits. Environmental benefits.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
What helped Conservation South Africa (1)
Effective collaboration among colleagues fostered teamwork; workers regrouped to help each other meet daily targets; general workers valued support from Team Leaders.
Reported by the partner · Round 3 · Conservation South Africa close-out report, Round 3
Sources
- Programme payroll records · Export dated 28 Sep 2026. Totals only; no personal data shown.
- DWS quaternary catchments · Via CSIR ArcGIS service, queried 7 Oct 2026
- Strategic Water Source Areas (2017) · SANBI BGIS, queried 7 Oct 2026
- Conservation South Africa quarterly report, Round 4 · Partner report. Cited by name and page only.
- Conservation South Africa close-out report, Round 3 · Partner report. Cited by name and page only.
- Conservation South Africa quarterly report, Round 4 · Partner report. Cited by name and page only.
Partner reports are cited by name and page only, never linked publicly.